However, during the restructuring a new parterre was built, bringing the crowd closer to the front rows.

The same materials were formed at 45° planes, that mark three strips of glass for lighting indoors, crowned by a white railing. Initially, the curves of the athletics track were designed at three centres. The base consisted of a bench of white granite, on which rested the socket in red plaster. After protests from the national executive Massimo Cartasegna (who had participated as an athlete in the 1908 Olympics), they were redesigned to a single centre. During the summer of 2009, more work was performed. Il concerto in programma il 13 luglio 2020 a Torino (Stadio Olimpico Grande Torino) è stato posticipato al 13 luglio 2021.I biglietti già acquistati rimarranno validi per la nuova data.

The parapet separation was lowered to 1.10 meters in all sectors and 444 new seats were added in the parterre, bringing the total stadium capacity to 27,994 seats.

Rammstein sarà in concerto a Torino nel 2021 per l’unica data italiana del nuovo tour europeo. The renovation project, consisting of two architects Verona Architect John Work Arteco and has maintained the existing structures, subject to the constraint of the Superintendency of Environmental and Architectural Heritage, and added new structures to withstand the vertical coverage of the entire plant, and a third ring of tiers, structurally continuous and cooperative coverage, with the corresponding part of the previous cover part 44 host closed boxes. 1,350 new seats were installed, in four rows behind the first row of the gallery, creating a new ring on the area where the old track. The capacity thus became approximately 27,500 seats. The end result, however, was that the track had an abnormal length of 446.38 metres. Bianchini and Ortensi), the athletic field, the Tower of Marathon and the ticket to 'Ing. However, due to the non-registration of the company grenade Championship (sanctioned definitively 9 August 2005), the City of Turin is the owner of the stadium and returned to complete the reconstructure. Prices are set by sellers/promoters & may be above, below or at face value Scroll down to see all ticket options and prices.

l’attesa è finita, unica data italiana il 13 luglio 2020 allo Stadio Olimpico Grande Torino. Stereoboard.com is a Ticket Comparison Service. Dopo il grande successo del nuovo album omonimo e dopo i numerosi “sold out” registrati nel tour degli stadi europei attualmente in corso, RAMMSTEIN sono sempre di più un punto di riferimento per il …

Rammstein Tickets für den am 13.07.2021 19:30 - Stadio Olimpico Grande Torino Turin einfach & 100% sicher beim Marktführer Eventim bestellen! After the Stadium's inauguration, it hosted several matches of the Between 1935 and 1986, Juventus were Italian champions 16 times, including five-in-a-row between 1931–1935, won 7 Italian Cups, several international titles, and one UEFA Cup (1976). The glass enclosure that separates the field from the spectators area, is mobile. Furthermore, the use of technology was high: heating coils were placed below the field for use during cold temperatures and, in case of rain, an automatic system can cover the ground. For ceremonies, expansion was made to 35,000 seats by temporary structures, plus construction of massive construction scenes for technical preparation of the Olympic flame. Rammstein will be performing 1 event in Turin on Tuesday 13th July 2021 at the Stadio Olimpico Grande Torino. From 1938 until the late 1950s, the stadium also housed the headquarters of the provisional Automobile Museum (opened in 1939). German metal band Rammstein have sold over 15 million records worldwide and since their formation in 1994, the band has not had one change in their line up! RAMMSTEIN. All rights reserved. This name has been attributed to the presence, since the time of the Municipal Stadium, in the area behind the curve itself, of a high tower, actually called "Marathon Tower", which opened near the entrance reserved for athletes participating in various kolous athletic contests. Work began in September 1932. The renovation of the stadium cost 30 million euros. 80 seats are reserved for disabled spectators in wheelchairs, including 64 located in two tribunes raised in the parterre of the first ring of separate stations, 12 in the grandstand and 4 in the boxes. This second level is reserved exclusively for journalists, commentators and prominent figures. The stadium was inaugurated on 14 May 1933 by the Secretary of the Party, Achille Starace, at the beginning of Littoriali. Approximately one third of the lining of the roof is translucent plastic, so as to avoid as much as possible that the shadow cast by itself can damage the turf due to less sunlight. 0,60 €/call incl.